f

Design Flow          WPDF

 Start month: 6

Duration:  24 months

Participant:

UCAM

AQUI

INRIA

UCB

VU

 

 

 

1

Objectives: The objective of this work package is to provide a complete design flow for embedded controller for safety critical application. The flow will contain the results of all work packages. This work package is the integration of the results of the entire project. It will see all partners involved and hopefully will be the master plan for the design of embedded controllers for safety critical systems.

2

Work Description: The overarching concepts will be taken from the work package on platform-based design. The initial steps of the flow will include the determination of the control algorithms using the hybrid system formalism. Then, the embedded software development step will be taken in close coordination with hardware architecture selection using the theory of meta-models. When moving from one level of abstraction to the next, the mapping tools will be applying the principles of implementation platform export when optimizing the choices at a given layers of abstraction. Successive refinement will be enforced. The tools used in the flow will be using the meta-model as an integration mechanism.

3

Deliverables

DDF1: Report on overall design flow. Development and distribution of case studies of design flow modeling and related meta-model based design flow modeling in 2 selected domains.

DDF2: Testing of the methodology on the two test cases. Reports on finding and feedback on the other work packages.

 

4

Milestones

Month 18: DFF1 report (public)

Month 24: DFF32 report (public)

Month 24: Final project deliverable

5

Interrelation with other WPs

WPDF will be based on input from all work packages.